| Chantier | car park flooring |
|---|---|
| Lieu | Dubai, Émirats arabes unis |
| Sous-catégorie | Stationnement |
| Construit en | 2024 |
| Ouvert en | 2024 |
| Application | The scope involved refurbishment of the basement car park flooring where the existing epoxy coating was peeling off and surface cracks were visible. |
| Date de début et de fin | 2024 |
| Type d’application | Installation de planchers |
| Propriétaire | ARCO Turnkey Solutions Llc |
| Installateurs | Gecko Middleeast Technical Services Llc |
| Architectes | Young Engineering Llc |
| Coordonnateur MAPEI | Ashok |