Chantier | car park flooring |
---|---|
Lieu | Dubai, Émirats arabes unis |
Sous-catégorie | Stationnement |
Construit en | 2024 |
Ouvert en | 2024 |
Application | The scope involved refurbishment of the basement car park flooring where the existing epoxy coating was peeling off and surface cracks were visible. |
Date de début et de fin | 2024 |
Type d’application | Installation de planchers |
Propriétaire | ARCO Turnkey Solutions Llc |
Installateurs | Gecko Middleeast Technical Services Llc |
Architectes | Young Engineering Llc |
Coordonnateur MAPEI | Ashok |