KERACOLOR FF

High performance cementitious grout, polymer modified, water-repellent with DropEffect®, for joints up to 6 mm.

Applications:
Easy to apply and finish, smooth and compact, interior and exterior, floor and wall grouting of all types of ceramic tiles (double-fired, single-fired, klinker, porcelain tiles, etc.), terracotta, stone material (natural stone, marble ,granite, agglomerates, etc.), glass and marble mosaics. Suitable for grouting joints in swimming pools, bathrooms, kitchens and particularly smooth and polished floor surfaces. The use of special hydrophobic additives (DropEffect® Technology) gives grouting mortars high water-repellent properties, making them less prone to dirtiness and with excellent durability.
Keracolor FF mixed with Fugolastic improves its final characteristics, reaching suitable strength even under particularly difficult conditions.

Technical data:
Pot life: approx. 2 hours.
Waiting time before finishing:
10-20 minutes.
Set to light foot traffic: approx. 24 hours.
Ready for use: 7-10 days.
Colours: 18.
Application: MAPEI rubber trowel or squeegee.
Finishing: MAPEI sponge or Scotch-Brite® pad.
EMICODE: EC1 R - extremely low emission level.
Storage: 12 months (25-22 kg bags), 24 months (5 kg boxes).

Consumption
depends on size of joint (see table on page 52).

Packaging
25-22 kg bags and 4x5 kg boxes,
depending on the colour.

Related documentation

Technical data sheet
Download

Color Palette

100 White
110 Manhattan 2000
111 Silver Grey
112 Medium Grey

Last Projects KERACOLOR FF

Category icon COMMERCIAL FACILITIES

2018

Central i-City Mall

Shah Alam, Malaysia

Floor/wall covering, Installation of floor and wall coverings

Category icon RESIDENTIAL BUILDINGS

2018/2019

Brisbane Skytower

Brisbane, Australia

Installation of floor and wall coverings, Sealants application, Surface preparation

Category icon COMMERCIAL FACILITIES

2019

Hang Lung Centre

Causeway Bay, Hong Kong

Concrete restoration, Installation of wall coverings

Category icon TRANSPORTATION

2016/2019

CV/2013/08 - Contract 6 Waterproofing Works at SVB & NVB

Liantang/Heung Yuen Wai Boundary Control Point, N.T., Hong Kong

Installation of floor and wall coverings, Waterproofing

Keep in touch

Subscribe to our newsletter to get Mapei news