Two-component epoxy primer with fillers.
May be coloured with MAPECOLOR PASTE.
TECHNICAL DATA:
Mixing ratio: component A : component B = 80 : 20.
Colour of mix: neutral.
Consistency of the mix: viscous fluid.
Density of mix (kg/m³): 1500.
Viscosity of the mix (mPa·s): 1,100 ± 100 (# 3 - rpm 50).
Pot life: 30 min.
Application temperature range: from +8°C to +35°C.
Dust dry at +23°C and 50% R.H.: 6 hours.
Set to light foot traffic at +23°C and 50% R.H.: 24 hours.
Final setting time: 7 days.
Storage: 24 months in its original sealed packaging.
Application: flat American trowel or smooth trowel.
Consumption: 0.3-0.7 kg/m² per coat, depending on the absorbency and characteristics of the substrate.
Packaging: 20 kg kits (A+B); 5 kg kits (A+B).

Related documentation

Technical data sheet
Download

Last Projects PRIMER SN

Category icon PUBLIC BUILDINGS AND URBAN DESIGN

2017/2019

Educational Center “Sirius”

Sochi, Russia

Installation of floors

Category icon PUBLIC BUILDINGS AND URBAN DESIGN

2016/2017

Bukit Panjang Public Library

Singapore

Resin floors application

Category icon PUBLIC BUILDINGS AND URBAN DESIGN

2019

Shui Wo Street Municiple Services Building

Kwun Tong, Hong Kong

Waterproofing

Category icon TRANSPORTATION

2016/2019

CV/2013/08 - Contract 6 Waterproofing Works at SVB & NVB

Liantang/Heung Yuen Wai Boundary Control Point, N.T., Hong Kong