TOPCEM PRONTO

Ready to use prepacked mortar for fast-drying (4 days) normal setting screeds with controlled shrinkage.

Applications:
Formation of floating and bonded screeds on existing and new slabs for the installation of ceramic tiles, stone material, or any other flooring where fast drying is required for short installation times. Topcem Pronto is ready to use and must be mixed just with water.
Topcem Pronto is the ideal solution where good quality graded aggregate is hard to find or for job sites such as those in city centres where the logistics involved in mixing conventional binders can be difficult. Topcem Pronto is suitable for screeds used in interiors and exteriors. Bonded screeds and patching (less than 35 mm thicknesses) first require the application of a Topcem Pronto and Planicrete anchoring slurry. ì
For floating screeds (thicknesses above 35 mm) lay a polyethylene sheet beforehand.

Technical data:
Recommended mixture ratio: one 25 kg bag of Topcem Pronto with 1.7 l of water.
Open time of the mixture: 40-60 minutes.
Set to light foot traffic: after 12 hours.
Waiting time before installation: 24 hours for ceramic tiles and 2 days for natural stone.
Residual moisture after 4 days: less than 2%.
EMICODE: EC1 R - extremely low emission level.
Storage: 12 months.

Consumption
18-20 kg/m2 per cm of thickness in relation
to the degree of compaction.

Packaging
25 kg bags.

Related documentation

Technical data sheet
Download

Last Projects TOPCEM PRONTO

Category icon COMMERCIAL FACILITIES

2018/2019

Cityplaza One

Taikoo Shing, Hong Kong

Waterproofing

Category icon PRODUCTION FACILITIES

2015

Visit Brewery

Penza, Russia

Resin floors application, Sealants application, Surface preparation, Waterproofing

Category icon SPORT FACILITIES

2014

Swimming pool of Beloyarskoy NPP

Zarechny, Russia

Installation of floor and wall coverings, Sealants application, Surface preparation, Waterproofing

Category icon PUBLIC BUILDINGS AND URBAN DESIGN

2013/2015

Yeltsin Center

Yekaterinburg, Russia

Concrete restoration, Surface preparation

Keep in touch

Subscribe to our newsletter to get Mapei news