Grand Paradiso Hotel

Location icon San Giovanni Rotondo, Italy
Hotel
Ref #: 5982
Category: TOURISM AND WELLNESS

Construction

Yard bathrooms and rooms
Location San Giovanni Rotondo, Italy
Subcategory HOTEL/INN
Application supply of products for ceramic installation and resins for interior design
Start and finish date 2017/2018
Application Type Resin floors application, Floor/wall covering, Waterproofing
Client HOTEL GRAN PARADISO
Contractor company ARTISTA DEL PENNELLO
Installer companies ARTISTA DEL PENNELLO
Architects ARCH. LOISCIO VINCENZO
Designers (for works) ARCH. LOISCIO VINCENZO
MAPEI Distributor SAVINO SRL
Project Manager ARCH. LOISCIO VINCENZO
MAPEI Coordination CANANRILE MICHELE - GUERRIERI RAFFAELE

Product used for the project

EPORIP

EPORIP

Two-component solvent free epoxy adhesive, for monolithic sealing of…
#ResourceNotFound: ProjectResources, inside#
New Construction : No
INTOMAP R1

INTOMAP R1

INTOMAP R1
#ResourceNotFound: ProjectResources, inside#
New Construction : No
KERAQUICK S1

KERAQUICK S1

High-performance, quick-setting, deformable cementitious adhesive with no…
#ResourceNotFound: ProjectResources, inside#
New Construction : No
MAPEFLOOR FINISH 52 W

MAPEFLOOR FINISH 52 W

Two-component, non-yellowing polyurethane finishing compound in water…
#ResourceNotFound: ProjectResources, inside#
New Construction : No
MAPENET 150

MAPENET 150

Alkali-resistant glass fibre mesh (in compliance with the ETAG 004 guide)…
#ResourceNotFound: ProjectResources, inside#
New Construction : No
PLANITOP 200

PLANITOP 200

One-component cementitious mortar with high bonding strength for interior…
#ResourceNotFound: ProjectResources, inside#
New Construction : No
PRIMER SN

PRIMER SN

Two-component epoxy primer with fillers. May be coloured with MAPECOLOR…
#ResourceNotFound: ProjectResources, inside#
New Construction : No
TOPCEM PRONTO

TOPCEM PRONTO

Ready to use prepacked mortar for fast-drying (4 days) normal setting…
#ResourceNotFound: ProjectResources, inside#
New Construction : No
TRIBLOCK P

TRIBLOCK P

Three-component, epoxy-cementitious primer for waterproofing damp…
#ResourceNotFound: ProjectResources, inside#
New Construction : No
ULTRACOLOR PLUS

ULTRACOLOR PLUS

High-performance, anti-efflorescence, quick-setting and drying…
#ResourceNotFound: ProjectResources, inside#
New Construction : No
ULTRATOP LOFT F

ULTRATOP LOFT F

One-component trowellable coarse-textured cementitious paste applied in…
#ResourceNotFound: ProjectResources, inside#
5500mq
New Construction : No
ULTRATOP LOFT F

ULTRATOP LOFT F

One-component trowellable coarse-textured cementitious paste applied in…
#ResourceNotFound: ProjectResources, inside#
5500mq
New Construction : No
ULTRATOP LOFT W

ULTRATOP LOFT W

One-component trowellable fine-textured cementitious paste applied in…
#ResourceNotFound: ProjectResources, inside#
5500mq
New Construction : No
ULTRATOP LOFT W

ULTRATOP LOFT W

One-component trowellable fine-textured cementitious paste applied in…
#ResourceNotFound: ProjectResources, inside#
5500mq
New Construction : No
QUARZO 0,25 - 0,5 - 0,9 - 1,2 - 1,9

QUARZO 0,25 - 0,5 - 0,9 - 1,2 - 1,9

Product not available for this market,
contact us
#ResourceNotFound: ProjectResources, inside#
New Construction : No
MAPEFIBRE ST30

MAPEFIBRE ST30

Product not available for this market,
contact us
#ResourceNotFound: ProjectResources, inside#
New Construction : No
MAPEFLOOR FINISH 50 N

MAPEFLOOR FINISH 50 N

Product not available for this market,
contact us
#ResourceNotFound: ProjectResources, inside#
New Construction : No
MAPEFLOOR FINISH 58 W

MAPEFLOOR FINISH 58 W

Product not available for this market,
contact us
#ResourceNotFound: ProjectResources, inside#
New Construction : No
PRIMER GRIP WHITE

PRIMER GRIP WHITE

Product not available for this market,
contact us
#ResourceNotFound: ProjectResources, inside#
New Construction : No
PRIMER LT

PRIMER LT

Product not available for this market,
contact us
#ResourceNotFound: ProjectResources, inside#
New Construction : No

Keep in touch

Subscribe to our newsletter to get Mapei news