Chantier | JW Marriott Miami |
---|---|
Lieu | Miami, É.-U. |
Sous-catégorie | Hôtel |
Construit en | 2016 |
Ouvert en | 2017 |
Application | JW Marriott Miami |
Date de début et de fin | 2016/2017 |
Type d’application | REVÊTEMENTS MURAUX |
Propriétaire | Marriott International, Inc. |
Entrepreneur | Diversified Construction and Engineering |
Installateurs | Diversified Construction and Engineering |
Distributeur MAPEI | National Waterproofing Supply |
Photographe | Raul Ballester |
Responsable de projet | Emerson Barahona |
Coordonnateur MAPEI | Carlos Hernandez |
Autre | Concrete-restoration products and a decorative protective coating were required to give a facelift to the JW Marriott Miami hotel. The restoration of the facade included the removal and replacement of large areas of detached finish, additional crack repair to the surface and finishing of the facade with an Elastocolor® weatherproof decorative-coating system. |