Sabah Ammonia Urea Plant

Location icon Sipitang, Malaisie
N° réf. : 60000036
Catégorie : INSTALLATIONS DE PRODUCTION

Réalisation

Chantier Sabah Ammonia Urea Plant
Lieu Sipitang, Malaisie
Sous-catégorie Usine
Construit en 2014
Ouvert en 2015
Application Tank Lining & Waterproofing
Type d’application Systèmes d’imperméabilisation
Propriétaire Petronas Chemicals Group Berhad
Entrepreneur Mitsubishi Heavy Industries / Apex Energy Sdn Bhd / PT Rekayasa Industri Consortium
Installateurs Hycrete Mecure Sdn Bhd
Architectes Architect HaoYun
Distributeur MAPEI Mapei Malaysia Sdn Bhd
Autre Construction of Petronas Chemicals Group Bhd’s Ammonia Urea Complex in Sipitang- Sabah started in mid-2012. The RM5 billion BEPCC contract – Basic and Detailed Engineering, Procurement, Construction and Commissioning – was undertaken by a consortium comprising Mitsubishi Heavy Industries, Apex Energy Sdn Bhd and PT Rekayasa Industri.

The SAMUR Project involves the development of a new fertiliser plant with urea production capacity of 1.2 million metric tons per annum (mmtpa). The plant will be located on 166 acres of land in the Sipitang Industrial Park, Sabah.

Also known as the SAMUR Project, the complex located in the Sipitang Oil & Gas Industrial Park comprises an ammonia plant, a urea plant, a granulation plant, integrated utility units and jetty facilities.

Completion is scheduled for February, 2016.

Besides waterproofing for the roof slab, a highly chemical-resistant and abrasion-resistant lining was required for the ammonia processing plant’s cooling tower.

Mapei Products: PRIMER SN, MAPECOAT VE825 AP, MAPETEX GRP225, PLASTIMUL MY, MAPETHENE TA 3MM

Produits utilisés pour le projet

2170
2170
Produit non offert pour ce marché,
nous contacter
561
561
Produit non offert pour ce marché,
nous contacter
942
942
Produit non offert pour ce marché,
nous contacter
2901 - PRIMER SN
PRIMER SN
Produit non offert pour ce marché,
nous contacter

Keep in touch

Subscribe to our newsletter to get Mapei news