Chantier | double road bridge |
---|---|
Lieu | Bucharest, Roumanie |
Sous-catégorie | Pont |
Construit en | 2010 |
Ouvert en | 2014 |
Application | application of anti-carbonation protection coat |
Date de début et de fin | 2014 |
Type d’application | REVÊTEMENTS MURAUX |
Propriétaire | BUCHAREST CITY HALL |
Entrepreneur | ASTALDI SPA |
Installateurs | ASTALDI SPA |
Distributeur MAPEI | ASTALDI SPA |
Autre | Two parallel passages for each sense, one with a length of 675.4 meters and the second with a length of 687.7 meters. The width of the two bridges is 7.8 meters. The contribution of MAPEI was to protect concrete structures against carbonation using the mos |