| Chantier | double road bridge |
|---|---|
| Lieu | Bucharest, Roumanie |
| Sous-catégorie | Pont |
| Construit en | 2010 |
| Ouvert en | 2014 |
| Application | application of anti-carbonation protection coat |
| Date de début et de fin | 2014 |
| Type d’application | REVÊTEMENTS MURAUX |
| Propriétaire | BUCHAREST CITY HALL |
| Entrepreneur | ASTALDI SPA |
| Installateurs | ASTALDI SPA |
| Distributeur MAPEI | ASTALDI SPA |
| Autre | Two parallel passages for each sense, one with a length of 675.4 meters and the second with a length of 687.7 meters. The width of the two bridges is 7.8 meters. The contribution of MAPEI was to protect concrete structures against carbonation using the mos |