Rothorn Sörenberg

Location icon Sörenberg, Sveitsi
The rock, especially in the last third towards Eisee, is cleaned in the first phase and loose areas are removed. The rock is sealed with a layer of shotcrete so that no more stones can fall down. At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting. This prevents ice from forming overhead and ensures the safety of winter sports enthusiasts.
Viitenumero: 4658
Kategoria: INFRASTRUKTUURI

Rakennus

Piha ceiling of the passage tunnel
Sijainti Sörenberg, Sveitsi
Alakategoria TUNNEL
Käyttö At the tunnel exit towards the Eisee, large drop spots can be observed. These are sealed with Mapelastic TU System and drained into a trench using a half shell or dimpled sheeting.
Aloitus- ja lopetuspäivä 2023
Käyttötyyppi Maanalaiset rakenteet
Asennusyritykset Gasser Felstechnik AG, Lungern
Projektipäällikkö Rothornbahn Sörenberg
Valokuvaajat Ramon Lehmann Fotografie
MAPEIn koordinaatio Urs Wirth

Projektiin käytetty tuote

MAPELASTIC TU SYSTEM
MAPELASTIC TU SYSTEM
Yksikomponenttinen ruiskutettava vesieriste kaikentyyppisten betonialustojen,…
LAMPOCEM Blitzzement
LAMPOCEM Blitzzement
Product not available for this market,
contact us
MAPEQUICK AF 300 DRY
MAPEQUICK AF 300 DRY
Product not available for this market,
contact us

Pysy ajan tasalla

Tilaa uutiskirjeemme saadaksesi uutisia Mapeilta