| Piha | CAF subfloor |
|---|---|
| Sijainti | Meinisberg, Sveitsi |
| Alakategoria | SCHOOL |
| Käyttö |
In the extension building of the Meinisberg school, a new CAF subfloor was installed to create a stable and even foundation for the subsequent floor coverings.
The execution ensures high load-bearing capacity and a durable base that meets the demands of school operations. |
| Aloitus- ja lopetuspäivä | 2024 |
| Käyttötyyppi | Lattia-asennukset |
| Asennusyritykset | Brodbeck AG, Biel |
| Arkkitehdit | Skop AG, Zurich |
| Projektipäällikkö | Municipality of Meinisberg |
| MAPEIn koordinaatio | David Dellenbach |