Piha | The existing gallery was extended by 320 metres with the new building. |
---|---|
Sijainti | Disentis, Sveitsi |
Alakategoria | TUNNEL |
Käyttö | By extending the avalanche gallery, the average duration of closures of the Lukmanier road can be reduced from 37 days today to 19 days in the future. A total of 9 400 m³ of Dynamon SR 912 CH was used. |
Aloitus- ja lopetuspäivä | 2021 |
Käyttötyyppi | Tiet |
Asennusyritykset | Matteo Muttoni Costruzioni SA, Via Murate 6, 6500 Bellinzona |
Projektipäällikkö | Kanton Graubünden |
MAPEIn koordinaatio | Marco Jungi |