Forchbahn of the tunnel in Zumikon

Location icon Zumikon, Sveitsi
Viitenumero: 4640
Kategoria: KULJETUS

Rakennus

Piha From 2022 to 2024, both tracks will be completely replaced and new points with a larger radius will be installed. Instead of the existing track structure with ballast and wooden sleepers, a solid concrete track will be installed.
Sijainti Zumikon, Sveitsi
Alakategoria TUNNEL
Käyttö The Forchbahn tunnel between Waltikon and Neue Forch, built in the 1970s, was renovated. Damage to the building fabric as well as various modernisation works were necessary. The work was carried out during ongoing railway operations.
Aloitus- ja lopetuspäivä 2022/2024
Käyttötyyppi Tiet
Asennusyritykset Diamantbohr AG
Projektipäällikkö Forchbahn AG
MAPEIn koordinaatio Reto Stutz

Projektiin käytetty tuote

ADESILEX PG2
ADESILEX PG2
Kaksikomponenttinen valumaton epoksiliima rakentavaan liimaukseen.…
CARBOPLATE S
CARBOPLATE S
Product not available for this market,
contact us

Pysy ajan tasalla

Tilaa uutiskirjeemme saadaksesi uutisia Mapeilta