Hospital

With its extensive products and systems for installing resilient floor in hospital and healthcare centres, Mapei offers the complete solutions with a particular focus on sustainability and properties, as well as ease and speed of installation.

 

floor screed TOPCEM PRONTO 305; skimming compound PLANIPREP SC; moisture-reduction barrier PLANISEAL VS-MY; self-levelling smoothing compound ULTRAPLAN CONTRACT; universal adhesive for resilient, textile floor & wall coverings ULTRABOND ECO V4 EVOLUTION; semi-gloss enamel for interior walls in healthcare facilities MAPECOAT ACT 196

Other Solutions for Vinyl Floorings

Projects

Category icon PUBLIC BUILDINGS AND PLACES

Go Fit Vallehermoso

Madrid, Spain

Installation of floors

Category icon PUBLIC BUILDINGS AND PLACES

Sunshine Coast University Hospital

Sunshine Coast, Australia

Floor/wall coverings

Category icon COMMERCIAL FACILITIES

Váci Greens Business Center

Budapest, Hungary

Installation of floors, Waterproofing systems

Category icon COMMERCIAL FACILITIES

Menara Harvey Norman

Petaling Jaya, Malaysia

Installation of floors

Video

Mapei System for Vinyl Tile Installation

Mapei's full solution for installing vinyl tiles. From floor screed to self-levelling smoothing compound and adhesive for floor…

Realta Mapei article

Joan Kirner Women's And Children's Hospital, Melbourne (Victoria, Australia)

Mar 8, 2021, 12:56 PM
Installing resilient materials in a cutting-edge facility mainly intended for mothers and their children.
Title : Joan Kirner Women's And Children's Hospital, Melbourne (Victoria, Australia)
Article author title :
Article Author Name :
Article Author Role :
Is Highlight : Yes
Hide project gallery : No
Period From : Jan 1, 2021, 00:00 AM
Period To : Jan 31, 2021, 00:00 AM

Installing resilient materials in a cutting-edge facility mainly intended for mothers and their children.

Mapei high-performance products ensured a proper preparation of the substrates, which is essential to guarantee a safe installation of resilient coverings. Waterproofing compounds such as MAPEGUM WPS were applied in the wet areas. Mapei adhesives (ROLLCOLL, ADESILEX G19, and ULTRABOND ECO V4 SP) ensured a perfect bonding of vinyl wall and floor coverings in record time, to meet the contractor’s needs.

 

Melbourne’s West has seen rapid and continuous growth for many years now, with increasing numbers building homes, raising families, and having babies. Consequently, this area has seen a growing demand for women’s and children’s health services.

The new Joan Kirner Women’s and Children’s Hospital was completed in May 2019 and provides a family-centred facility that allows women in the district to give birth closer to home. The centre will provide care for thousands of children in the decades to come.

The hospital boasts modern health care facilities with eye-catching art and design, as well as the world’s first-ever neonatal intensive care unit, 39 special care nursery cots, 64 maternity beds, 32 paediatric beds, 20 labour delivery rooms, and 4 dedicated operating theatres.

This facility is a fitting testament to Joan Kirner’s legacy. Victoria’s first female premier (1990–1992), Joan Kirner was a social justice warrior and a tireless voice for women, children, and families.

 

DESIGNED FOR FAMILIES

The design was developed by Lyons architects with a “Salutogenic” approach to the build. Natural colour schemes, spaces with views, plenty of natural light and intuitive way-finding which is simulated by the use of shapes and dynamic, modern design.  The floors and walls have seamless cohesion as circular shapes sprawl over each level, colour co-ordinated with all other finishes of the build. The building itself has become a jewel in the heart of the western region of Melbourne.

The technicoloured interior is truly breathtaking. Each level has a different colour scheme associated with the branch of healthcare it coincides with. Floor to wall vinyl accompanied by circular shapes promotes relaxation, warmth and creativity to the patients treated in this space.

 

 

SUBSTRATE PREPARATION

Floor91 was the company contracted to complete the installation of the wall and floor coverings in the first stage of the refurbishment. Preparation included extensive diamond grinding, screeding and waterproofing. Materials installed ranged from floor and wall vinyl to carpet tiles, matting and stair nosing. The 8 Level installation took place over 6 months with 85% of the work completed over 18 weeks.

Mapei products were used for substrate preparation as well for the installation of the floor and wall coverings. 

With over 80% of the concrete floors needing to be levelled, the substrates were firstly primed using ECO PRIM T PLUS, low odour acrylic primer in water dispersion with very low emission level of volatile organic compounds (VOC), followed by the application of ULTRAPLAN, a self-levelling, ultra quick-hardening smoothing compound for thicknesses from 1 to 15 mm, with a very low emission level of VOC, preparing substrates to receive any kind of floor covering where an excellent resistance to loads and traffic is required.

Concrete substrates that only required small patching repairs were rectified using PLANIPREP SC, a fibre-reinforced skim coating compound distributed in Australia by Mapei Australia, and NIVORAPID, ultra-fast setting, thixotropic, cementitious levelling compound for horizontal and vertical surfaces.

Some parts of the flooring had lead sheeting installed to act as a barrier between x-ray rooms and offices.

These areas were levelled using NIVORAPID mixed with LATEX PLUS to improve the deformability and bonding strength of the levelling mortar.

 

 

WATERPROOFING WET AREAS

The floors and walls in the bathrooms and wet areas were waterproofed using MAPEGUM WPS, fast drying flexible liquid waterproofing membrane. Once the second coat of this product was dry, the substrates in these areas were primed with a layer of undiluted ECO PRIM T PLUS, smoothed with PLANIPREP SC in preparation to install the vinyl coverings.  MAPEFLEX PU 45 FT paintable, rapid, high modulus polyurethane sealant and adhesive was used for sealing expansion and distribution joints. All wet area vinyl coverings were installed using ADESILEX G19, two-component, epoxy-polyurethane adhesive for resilient and textile floorings.

 

 

INSTALLING VINYL AND TEXTILE COVERINGS

Over 60,000 m2 of vinyl floors supplied by Tarkett were installed in the public areas using ULTRABOND ECO V4 SP, a high-performance adhesive especially suitable for installing PVC and rubber flooring as well as a universal adhesive for all common resilient floor coverings.

About 28,000 m2 of vinyl coverings were, on the other hand, installed on walls using  ROLLCOLL, a universal adhesive in water dispersion for vinyl and textile floor and wall coverings. In other areas, textile floors were installed by using ULTRABOND ECO TACK, acrylic tackifier dispersed in water with a very low emission level of volatile organic compounds (VOC).

Issue Number :
  • 84
Realtà Mapei Categories :
  • Projects
Realtà Mapei Tags :
  • hospital
realtamapeislider :
Product lines :
  • Elastic sealants and adhesives
  • Products for resilient, LVT and textile materials
  • Products for waterproofing
Paragraph1 Videos :
Paragraph1 Record Numbers
Paragraph2 Videos :
Paragraph2 Record Numbers
Paragraph3 Videos :
Paragraph3 RecordNumbers
Paragraph4 Videos :
Paragraph4 Record Numbers
Paragraph5 Videos :
Paragraph5 Record Numbers
Paragraph6 Videos :
Paragraph6 Record Numbers
Paragraph7 Videos :
Paragraph7 Record Numbers
Paragraph8 Videos :
Paragraph8 Record Numbers
Related youtube videos
Local project
Related quotes
Related products
Related Projects
Related Articles
Related special :

Products in the spotlight

TOPCEM PRONTO 305

TOPCEM PRONTO 305

Ready-to-use, normal-setting, multi-purpose, cementitious floor screed Topcem Pronto 305 is a pre-blended, ready-to-use mortar with normal…
PLANIPREP SC

PLANIPREP SC

High-peformance, fiber-reinforced skimcoating compound. Planiprep SC is a high-performance, polymer-modified, fiber-reinforced cement-based…
NOVOPLAN 21

NOVOPLAN 21

Fast hardening self-levelling smoothing compound for thicknesses from 1 to 5 mm. Where to use: Interior levelling of new or existing…
ULTRABOND 333

ULTRABOND 333

Multi-purpose adhesive with long open time for vinyl, textiles and linoleum floor and wall coverings. TECHNICAL DATA: Consistency: creamy…
PLANISEAL VS-MY

PLANISEAL VS-MY

Epoxy-moisture reduction barrier for cementitious substrates
ULTRAPLAN CONTRACT

ULTRAPLAN CONTRACT

Self-levelling, ultra quickhardening smoothing compound for thicknesses from 1 to 10 mm per coat

Technical Brochures

GuidaLisciatureAutolivellanti-Cop-GB12-2015
A Guide for Choosing Self-Levelling And Thixotropic Smoothing Compounds for Resilient and Textile Floor Coverings
broch_hospitalscopgb12-20
Hospital: Soft Covering Installation Systems
Cat_ResilientiCop-GB12-19
Products for the Installation of Resilient, LVT and Textile Floorings

The best support for every type of floor

These floors are surfaces exposed to intense traffic and constant use such as in hospitals, schools, airports, offices, shops and industrial environments. Various factors have to be carefully analysed (moisture content, the flatness and evenness of the substrate, etc.) to guarantee durability and maximum performance. 

This line of products includes adhesives, smoothing and levelling compounds and primers for installing resilient and acrylic and polyurethane resin flooring.

13.Innovazione

INNOVATION

All our products are tested in special environmental simulation chambers.

23.Sostenibilita

ECO-SUSTAINABILITY

We have been awarded certification from various international programmes for safeguarding the environment and health.

14.Internazionalita

INTERNATIONALITY

The range is comprehensive in order to cater for different requirements all around the world.

Do you need assistance?

For more information, please enquire via email to mapei@mapei.com.my

For some selected products like Novoplan 21 and TopCem Pronto 305, are available in selected hardware stores. Please enquire direct to MAPEI Whatsapp

Keep in touch

Subscribe to our newsletter to get Mapei news