PRIMER SN

Two-component epoxy primer with fillers.
May be coloured with MAPECOLOR PASTE.
TECHNICAL DATA:
Mixing ratio: component A : component B = 80 : 20.
Colour of mix: neutral.
Consistency of the mix: viscous fluid.
Density of mix (kg/m³): 1500.
Viscosity of the mix (mPa·s): 1,100 ± 100 (# 3 - rpm 50).
Pot life: 30 min.
Application temperature range: from +8°C to +35°C.
Dust dry at +23°C and 50% R.H.: 6 hours.
Set to light foot traffic at +23°C and 50% R.H.: 24 hours.
Final setting time: 7 days.
Storage: 24 months in its original sealed packaging.
Application: flat American trowel or smooth trowel.
Consumption: 0.3-0.7 kg/m² per coat, depending on the absorbency and characteristics of the substrate.
Packaging: 20 kg kits (A+B); 5 kg kits (A+B).

Certifications

Related documentation

Technical data sheet
Download

Last Projects PRIMER SN

Category icon COMMERCIAL FACILITIES

2017/2018

Mapletree Logistics Hub

Port of Tanjung Pelepas, Malaysia

Resin floors application, Installation of floors

Category icon SPORT FACILITIES

2019

Yuk Chai Primary School Basketball Court

Petaling Jaya, Malaysia

Solutions for sports flooring

Category icon PUBLIC BUILDINGS AND URBAN DESIGN

2017/2019

Educational Center “Sirius”

Sochi, Russia

Installation of floors

Category icon PUBLIC BUILDINGS AND URBAN DESIGN

2016/2017

Bukit Panjang Public Library

Singapore

Resin floors application

Keep in touch

Subscribe to our newsletter to get Mapei news