Yard | interior istallation |
---|---|
Location | Rostov-na-Dony, Russia |
Subcategory | SWIMMING POOL, Aquatic Centre |
Built in | 2010 |
Opened in | 2013 |
Application | System to the swimming pool installation. Waterproofing. Facing surfaces. Joints grout |
Start and finish date | 2010/2013 |
Application Type | Waterproofing systems, Surface preparation, Tile & stone installation systems |
Client | Gorizont" |
Contractor company | Gorizont" |