 Disentis, Switzerland
                                
                                    Disentis, Switzerland
                                
                             
                            | Yard | The existing gallery was extended by 320 metres with the new building. | 
|---|---|
| Location | Disentis, Switzerland | 
| Subcategory | TUNNEL | 
| Application | By extending the avalanche gallery, the average duration of closures of the Lukmanier road can be reduced from 37 days today to 19 days in the future. A total of 9 400 m³ of Dynamon SR 912 CH was used. | 
| Start and finish date | 2021 | 
| Application Type | Road maintenance and urban design | 
| Installer companies | Matteo Muttoni Costruzioni SA, Via Murate 6, 6500 Bellinzona | 
| Specialists involved | Kanton Graubünden | 
| MAPEI Coordination | Marco Jungi | 
 
                                 
                                 
                                     
                                    