 San Giorgio Canavese, Italy
                                
                                    San Giorgio Canavese, Italy
                                
                             
                            | Yard | tunnel | 
|---|---|
| Location | San Giorgio Canavese, Italy | 
| Subcategory | TUNNEL | 
| Built in | 2012 | 
| Opened in | 2012 | 
| Application | repair of interior walls and coatings | 
| Application Type | Concrete restoration systems | 
| Client | Attiva | 
| Contractor company | Asfalt CCP | 
| Installer companies | Water Costruzioni | 
| Architects | Attiva Engineering | 
| Credits | Bruno Zamorani | 
| Project Manager | ing. Cerruti | 
 
                                 
                                 
                                 
                                 
                                