Rashid Hospital

Location icon Dubai, United Arab Emirates

Construction

Product used for the project

ISOLASTIC
ISOLASTIC
Elasticising latex mixed with KERABOND T, KERAFLOOR and ADESILEX P10. When…
KERABOND T
KERABOND T
TECHNICAL DATA: Open time: 20 minutes. Waiting time before grouting: – on…
PRIMER G
PRIMER G
Synthetic resin primer in water dispersion with a very low content of volatile…
PRIMER SN
PRIMER SN
Two-component epoxy primer with fillers. May be coloured with MAPECOLOR PASTE.…
ULTRAPLAN
ULTRAPLAN
Ultra-fast drying self-levelling compound for interiors

Keep in touch

Subscribe to our newsletter to get Mapei news