The Dubai Health Authority (DHA) Headquarter

Location icon Dubai, United Arab Emirates
Ref #: 51930
Category: PUBLIC BUILDINGS AND URBAN DESIGN

Construction

Yard Interior floors
Location Dubai, United Arab Emirates
Subcategory OFFICES
Application Cementitious and Resin Floor Coverings
Start and finish date 2017/2018
Application Type Floor/wall covering
Contractor company Horizon 7 Technical Service LLC

Product used for the project

ECO PRIM GRIP

ECO PRIM GRIP

Ready-to-use bonding promoter and primer made from synthetic acrylic resin...
Internal
New Construction : No
MAPEFLOOR FINISH 58 W

MAPEFLOOR FINISH 58 W

Two-component, aliphatic, transparent or coloured, matt polyurethane...
Internal
New Construction : No
PRIMER SN

PRIMER SN

Two-component epoxy primer with fillers. May be coloured with MAPECOLOR...
Internal
New Construction : No
TOPCEM

TOPCEM

Special fast setting hydraulic binder for the preparation of normal...
Internal
New Construction : No
ULTRAPLAN

ULTRAPLAN

Ultra-fast drying self-levelling compound Applications: Interior...
Internal
New Construction : No
ULTRATOP LOFT W

ULTRATOP LOFT W

One-component trowellable fine-textured cementitious paste applied in...
Internal
New Construction : No

Keep in touch

Subscribe to our newsletter to get Mapei news