| Yard | Third Harbor Tunnel | 
|---|---|
| Location | Boston, USA | 
| Subcategory | TUNNEL | 
| Built in | 1992 | 
| Opened in | 1997 | 
| Application | Tunnel covering with ceramic tiles | 
| Application Type | Wall coverings | 
| Architects | Ing. Bob Vesey | 
                                                    
                                                    Here you can download all documents related to this project