Klang Valley Mass Rapid Transit (KVMRT)

Location icon Malaysia
Ref #: 60000032
Kategorija: INFRASTRUKTURA

Građevinski radovi

Područje zahvata Klang Valley Mass Rapid Transit (KVMRT)
Lokacija Malaysia
Podkategorija METRO
Godina izgradnje 2013
Otvoreno 2014
Opis izvođenih radova Klang Valley Mass Rapid Transit (KVMRT) - Bukit Bintang Central Underground Station
Datum početka i završetka 2013/2014
Vrsta radova Izvođenje hidroizolacije
Investitor Mass Rapid Transit Corporation Sdn Bhd
Glavni izvođač radova MMC Gamuda KVMRT (T) Sdn Bhd
Izvođač radova CRT Specialist (M) Sdn Bhd
Projektant Mott MacDonald (M) Sdn Bhd (Engineers)
MAPEI distributer Mapei Malaysia Sdn Bhd
Opis izvođenih radova The Bukit Bintang Central station is constructed using the “cut-and-cover” method with a total excavation depth of 33m. It has a footprint of 150m x 19.0m with depths of 16.9m from existing ground level to the top of rail level for the upper platform and 30.4m to the top of rail level for the lower platform. The station consists of four levels namely concourse, upper platform, plant-room platform and lower platform. The main contractor wanted a durable, high-performance waterproofing system, "MAPEI Purtop" for the roof slab to provide long-term, low-maintenance protection against water ingress. (The walls were protected using a drainage system.)

Proizvod korišten na projektu

BIBLOCK
BIBLOCK
Dvokomponentni epoksi temeljni premaz i vezno sredstvo u vodenoj emulziji.…
MAPEGEL UTT SYSTEM
MAPEGEL UTT SYSTEM
Three-component flexible hydrophilic gel for waterproofing injection in…
PRIMER SN
PRIMER SN
Dvokomponentni epoksidni temeljni premaz s punilima, bez otapala. Može se…
PURTOP 1000
PURTOP 1000
Dvokomponentna hidroizolacija bez otapala na bazi čiste poliuree. Za…
434 - IDROSTOP SW
IDROSTOP SW
Product not avalaible for this market,
contact us
943 - IDROSTOP TUBOFLEX
IDROSTOP TUBOFLEX
Product not avalaible for this market,
contact us

Ostanimo u kontaktu

Pretplatite se na naš newsletter i prvi saznajte sve Mapei novosti