Cantiere | JW Marriott Miami |
---|---|
Località | Miami, USA |
Sottocategoria | HOTEL |
Costruito nel | 2016 |
Inaugurato nel | 2017 |
Intervento | JW Marriott Miami |
Inizio e fine dei lavori | 2016/2017 |
Tipo di intervento | Interventi di facciata |
Committente | Marriott International, Inc. |
Impresa appaltatrice | Diversified Construction and Engineering |
Imprese esecutrici | Diversified Construction and Engineering |
Distributore MAPEI | National Waterproofing Supply |
Credits | Raul Ballester |
Direttore lavori | Emerson Barahona |
Coordinatore MAPEI | Carlos Hernandez |
Altro | Concrete-restoration products and a decorative protective coating were required to give a facelift to the JW Marriott Miami hotel. The restoration of the facade included the removal and replacement of large areas of detached finish, additional crack repair to the surface and finishing of the facade with an Elastocolor® weatherproof decorative-coating system. |