| Cantiere | piscine a locali umidi |
|---|---|
| Località | Flitwick, Bedfordshire, Regno Unito |
| Sottocategoria | CENTRO SPORTIVO |
| Intervento | posa di ceramica in ambienti umidi e piscine |
| Inizio e fine dei lavori | 2016 |
| Tipo di intervento | Posa di pavimenti e rivestimenti a parete |
| Committente | Stevenage Leisure Ltd. |
| Impresa appaltatrice | Tiletec Group |
| Imprese esecutrici | Tiletec Group |
| Altro | The £14.7m new build leisure centre comprises a 25m2 competition pool, 13m2 learner pool (with raised floor) and confidence water pool. In addition to the pools, there are four discrete changing/shower areas which have been fully tiled; wet change, dry change, outside change and fitness suite changing, along with floor tiling to circulation areas and staircases amounting to a further 750m2 of tiling. |