Cantiere | piscine a locali umidi |
---|---|
Località | Flitwick, Bedfordshire, Regno Unito |
Sottocategoria | CENTRO SPORTIVO |
Inaugurato nel | 2016 |
Intervento | posa di ceramica in ambienti umidi e piscine |
Tipo di intervento | Posa di pavimenti e rivestimenti a parete |
Committente | Stevenage Leisure Ltd. |
Impresa appaltatrice | Tiletec Group |
Imprese esecutrici | Tiletec Group |
Altro | The £14.7m new build leisure centre comprises a 25m2 competition pool, 13m2 learner pool (with raised floor) and confidence water pool. In addition to the pools, there are four discrete changing/shower areas which have been fully tiled; wet change, dry change, outside change and fitness suite changing, along with floor tiling to circulation areas and staircases amounting to a further 750m2 of tiling. |