Cantiere | Inside. |
---|---|
Località | Turchia |
Sottocategoria | MAGAZZINO |
Costruito nel | 2022 |
Inaugurato nel | 2022 |
Intervento |
Cementitious flooring
After necessary substrate preparation and repair works of the concrete floors of PEPSICO İstanbul Europe Warehouse were completed, epoxy based primer PRIMER SN was applied which was then followed by the application of the cementitious based industrial flooring ULTRATOP. Final step was the application of MAPECOAT STAIN PROTECTION as the protective top coat over ULTRATOP. |
Inizio e fine dei lavori | 2022 |
Tipo di intervento | Posa di pavimenti e rivestimenti a parete |
Impresa appaltatrice | Açısal İnşaat |
Imprese esecutrici | Poseidon Mühendislik |
Direttore lavori | Halil Yuşa Yağcı |