Cantiere | edifico Patrimonio dell'UNESCO |
---|---|
Località | Wrocław, Polonia |
Sottocategoria | |
Costruito nel | 1911 |
Inaugurato nel | 1913 |
Intervento |
fornitura di prodotti per la posa e il trattamento protettivo del parquet
The existing cement screed required filling and sanding to obtain a clean and adhesive substrate that only required local filling of cracks and removal of defects. 40 meters of cracks and fissures were filled with EPORIP TURBO. The remaining renovation of the substrate was carried out using PLANITOP 400. The finishing layer of the parquet was made using the ULTRACOAT varnish system. The oak parquet flooring was installed using ULTRABOND P902 2K, two-component epoxy-polyurethane adhesive, which allows for foot traffic after just 24 hours. The skirting boards were attached using ULTRABOND SUPER GRIP. The oak parquet was covered with a two-component primer in water dispersion, ULTRACOAT P920 2K. |
Inizio e fine dei lavori | 2011 |
Tipo di intervento | Products for wood flooring |
Committente | City of Breslavia |
Imprese esecutrici | Centrum Parkietowe Nowak |
Progettisti | Max Berg |
Distributore MAPEI | Mapei Polska |
Direttore lavori | Daniel Nowak, Wojciech Sikora |
Coordinatore MAPEI | Wojciech Sikora, Mapei Polska |
Link alla pagina di dettaglio | https://www.mapei.com/pl/pl/aktualnosci/szczegoly-wydarzenia/2025/01/28/hala-stulecia-we-wroc%C5%82awiu |
Qui puoi scaricare tutti i documenti relativi al progetto