Cantiere | The new South Beach Hotel |
---|---|
Località | Singapore |
Sottocategoria | HOTEL |
Costruito nel | 2012 |
Inaugurato nel | 2015 |
Intervento | Adhesives solutions for the South Beach hotel |
Inizio e fine dei lavori | 2012/2015 |
Tipo di intervento | Posa di pavimenti e rivestimenti a parete |
Impresa appaltatrice | Hyundai Engineering & Construction Co. Ltd |
Imprese esecutrici | ASR Building & Conservation Pte Ltd, Aegis Building & Engineering Pte Ltd, SJ Marble (Singapore) Pte Ltd |
Progettisti | Aedas Pte Ltd |
Distributore MAPEI | Mapei Far East Pte Ltd |
Altro |
Mapei adhesives were used extensively in the washrooms of all 654-guestrooms and hotel lobby. In both areas, Keraflex was used for fixing marble onto floors and Keraflex Maxi S1 was used for fixing marble onto walls. Keracolor SF was used for grouting the joints. |