| Kho bãi | safety tunnel, roadway, sidewalks |
|---|---|
| Vị trí | Noiraigue, Switzerland |
| Danh mục con | HẦM |
| Ứng dụng |
The project first includes the construction of a safety tunnel parallel to the existing tunnel, connected by six cross-passages serving as emergency exits.
Afterwards, the tunnel will be refurbished with the complete renovation of the drainage systems, the roadway, the sidewalks, and the electromechanical equipment. |
| Ngày bắt đầu và hoàn thành | 2024/2026 |
| Loại ứng dụng | ChỐng thẤm |
| Công ty lắp đặt | Consortium CNTCL (Infra tunnel, Bieri Grisoni, Facchinetti, Bernasconi) |
| Kiến trúc sư | BG Ingénieurs Conseils SA, Neuchâtel | OPAN concept SA, Neuchâtel |
| Quản lý dự án | Canton of Neuchâtel |
| Điều phối MAPEI | Alexandre Perona |