Sabah Ammonia Urea Plant

Location icon Sipitang, Malajzia
Ref #: 60000036
Kategória: VÝROBNÉ ZÁVODY

Výstavba

Popis Sabah Ammonia Urea Plant
Poloha Sipitang, Malajzia
Podkategória PLANT
Postavené v roku 2014
Otvorené v roku 2015
Aplikácia Tank Lining & Waterproofing
Typ aplikácie Hydroizolácia
Vlastník Petronas Chemicals Group Berhad
Dodávateľská spoločnosť Mitsubishi Heavy Industries / Apex Energy Sdn Bhd / PT Rekayasa Industri Consortium
Realizačná spoločnosť Hycrete Mecure Sdn Bhd
Architekti Architect HaoYun
Distribútor MAPEI Mapei Malaysia Sdn Bhd
Popis Construction of Petronas Chemicals Group Bhd’s Ammonia Urea Complex in Sipitang- Sabah started in mid-2012. The RM5 billion BEPCC contract – Basic and Detailed Engineering, Procurement, Construction and Commissioning – was undertaken by a consortium comprising Mitsubishi Heavy Industries, Apex Energy Sdn Bhd and PT Rekayasa Industri.

The SAMUR Project involves the development of a new fertiliser plant with urea production capacity of 1.2 million metric tons per annum (mmtpa). The plant will be located on 166 acres of land in the Sipitang Industrial Park, Sabah.

Also known as the SAMUR Project, the complex located in the Sipitang Oil & Gas Industrial Park comprises an ammonia plant, a urea plant, a granulation plant, integrated utility units and jetty facilities.

Completion is scheduled for February, 2016.

Besides waterproofing for the roof slab, a highly chemical-resistant and abrasion-resistant lining was required for the ammonia processing plant’s cooling tower.

Mapei Products: PRIMER SN, MAPECOAT VE825 AP, MAPETEX GRP225, PLASTIMUL MY, MAPETHENE TA 3MM

Produkt použitý v projekte

PRIMER SN
PRIMER SN
Dvojzložkový epoxidový základný náter s obsahom plniva, vhodný v súlade…

Ostaňme v spojení

Odoberajte náš Newsletter a buďte informovaný o novinkách Mapei