Yard | Terminal |
---|---|
Location | Abu Dhabi, United Arab Emirates |
Subcategory | AIRPORT |
Built in | 2012 |
Opened in | 2023 |
Application | Our contribution included advanced adhesives, sealants, repairs, and waterproofing systems, essential for ensuring the durability and integrity of various structural elements. |
Start and finish date | 2016/2023 |
Application Type | Sealants application, Waterproofing, New building, Cemetitious and resin floor coverings |
Client | M/s Abu Dhabi Airports Co. (ADAC) |
Contractor company | M/s Trojan General Contracting M/s BIC Contracting LLC M/s TAV / CCC / ARABTEC JV |
Installer companies | M/s GCS GERMAN CONCRETE WORKS M/s ASP ACCESS FLOORS LLC M/s BOND INTERIOR DESIGN LLC M/s BOWYER WICK BUILDING M/s DEEMAH STONE M/s DEPA DEC.GEN.CONT.& MAIN.CO. L.L.C |
Architects | M/s BNP Paribas. M/s Kohn Pedersen Fox Associates (KPF). M/s Kellogg Brown & Root (KBR). M/s Turner & Townsend. (Cost Management) M/s Skidmore, Owings & Merrill (SOM). M/s E.Construct FZ LLC. |
Technical Services at 1-800-992-6273
Customer Service at 1-800-426-2734 (1-800-42-MAPEI)