Brickell Key Bridge

Location icon Miami, USA
Ref #: 200511
Category: INFRASTRUCTURES

Construction

Yard 247 meters link bridge
Location Miami, USA
Subcategory BRIDGE
Built in 1947
Opened in 1947
Application supply of products for concrete pillars and road repair
Start and finish date 2010/2011
Application Type Concrete restoration
Client City of Miami
Contractor company Fibrwrap Construction
Installer companies Fibrwrap Construction
Architects Engineer - Metric Engineering
MAPEI Distributor Construction Materials, White Cap, E&E Construction Supply
Credits Raul Ballester and Autumn Nelson
Project Manager Jason Alexander
MAPEI Coordination Steve Bradway, Mapei Corp. (USA)

Additional Attachments

Here you can download all documents related to this project

Product used for the project

Planibond 3C

Planibond 3C

Three-Component, Cementitious Corrosion Inhibitor and Bonding Agent…
Internal
New Construction : No
Planibond AE

Planibond AE

High-Strength, Non-Sag, Epoxy Anchoring Gel Planibond AE is a…
Internal
New Construction : No
Planiseal Traffic Coat

Planiseal Traffic Coat

Epoxy Overlay for Vehicular and Pedestrian Traffic Planiseal Traffic Coat…
Internal
New Construction : No
Planitop 15

Planitop 15

Form-and-Pour, One-Component Repair Mortar Planitop 15 is a…
Internal
New Construction : No
Planitop XS

Planitop XS

One-Component, Fast-Setting, Extended-Working-Time, Vertical and Overhead…
Internal
New Construction : No

Keep in touch

Subscribe to our newsletter to get Mapei news