Audrey came to MAPEI in 2003 and is currently the Manager for MAPEI’s Technical Services Product Support Group. She oversees an extremely talented group of flooring industry professionals who answer questions about our products through our website and our 1-800 numbers. Audrey holds Associate degrees in Industrial Management and Building Construction and has a Journeyman level Tile Certification from the State of Florida.
Get notified of the next posting
Enter your email address
Subscribe
Search keywords
Latest posts
Time-Saving options for moisture-resistant installations
by Audrey Chapman
Beachfront Water Repellents and Sealers
by Marta Pineda
Tile Installation Basics
by Denise Hibson
Archives
July 2018
May 2018
March 2018
February 2018
January 2018
October 2017
August 2017
June 2017
May 2017
April 2017
December 2016
November 2016
October 2016
September 2016
August 2016
July 2016
June 2016
May 2016
April 2016
March 2016
February 2016
January 2016
December 2015
November 2015
October 2015
September 2015
August 2015
July 2015
June 2015
May 2015
April 2015
July 23, 2018 - 21.41
Time-Saving options for moisture-resistant installations
by Audrey Chapman
Have you ever been asked to complete a 48-hour LVP job in a 12-hour window? When and how did project weather delays become YOUR problem?

Flooring Subcontractor to MAPEI Sales Rep.: Hey MAPEI! I got this LVP job. It’s just two ground floor offices and a store front area.
MAPEI Sales Rep.: OK, good. 
Flooring Subcontractor to MAPEI Sales Rep.: The GC is behind on the schedule because of the big storm. 
MAPEI Sales Rep.: OK.
Flooring Subcontractor to MAPEI Sales Rep.: They just poured the slab two weeks ago. There’s no time for moisture testing. The PM just called me and asked if I could do this job on Saturday. You got anything for this?
MAPEI Sales Rep.: Yes! Yes, we do! MAPEI's Planiprep® MRS and Ultrabond® G15Planiprep MRS is a hydraulic-cement-based skimcoating compound with no moisture limits. Try to get the offices skimcoated by 9:00 a.m. and then get the retail areas skimcoated before lunch. When you come back from lunch, use Ultrabond G15 to install the LVP. Ultrabond G15 is a two-part epoxy adhesive with no moisture limits. As you are installing, you will put a pressure-applied coat of Ultrabond G15 over the concrete using the flat side of the trowel. This step will give you the moisture protection that you need. Then, you will immediately comb the ridges with the notched side of the trowel and set the LVP into the wet glue. You will have to work backwards towards the door and stay off the floor for at least 6 hours. But, you should be able to finish everything in one day.  
Flooring Subcontractor to MAPEI Sales Rep.: That’s great! Thanks MAPEI!

Our Product Support line, (800) 992-6273, is available from 8:00-5:30 EST Monday-Friday to assist you with your installation.