ISOLASTIC

Elasticising latex mixed with KERABOND, KERABOND T and ADESILEX P10. When KERABOND, KERABOND T and KERABOND PLUS are mixed with ISOLASTIC they form a high-performance, highly deformable adhesive with extended open time (C2E/S2).
When ADESILEX P10 is mixed with ISOLASTIC (dilution rate 1:1 with water), it forms a high-performance, highly deformable adhesive with extended open time (C2E/S1).
TECHNICAL DATA OF KERABOND/KERABOND T/KERABOND PLUS+ISOLASTIC:
Pot life of mix: more than 8 hours.
Open time: 20 minutes.
Waiting time before grouting:
– on walls: 4-8 hours;
– on floors: 24-36 hours.
Set to light foot traffic: 24-36 hours.
Ready for use: approx. 14 days.
Deformability according to EN 12004: S2 - highly deformable (ADESILEX P10 + ISOLASTIC diluted 1:1 with water - S1 deformable).
EMICODE: EC1 Plus - very low emission.
Application: KERABOND/KERABOND T/KERABOND PLUS + ISOLASTIC: N° 4, 5 or 6 notched trowel.
ADESILEX P10/SOLASTIC diluted 1:1 with water: N° 4, 5 or 6 notched trowel.
Storage: 24 months. Protect from frost.
Consumption: 1-2 kg/m².
Packaging: 5 and 25 kg drums.

Certifications

Related documentation

Technical data sheet
Download
Safety Data Sheet
Download
EPD
Download
GEV
Download
P.A.S.S.
Download

Last Projects ISOLASTIC

Category icon TOURISM AND WELLNESS

2015/2016

Caramell Premium Resort

Bükfürdő, Hungary

Installation of floors, New building, Waterproofing

Category icon PUBLIC BUILDINGS AND URBAN DESIGN

2019/2020

St. Paul's Catholic Day Nursery

Tai Po, Hong Kong

Masonry restoration, Floor/wall covering

Category icon COMMERCIAL FACILITIES

2018/2020

Commercial Bay

Auckland, New Zealand

Installation of floors, Sealants application, Surface preparation, Waterproofing

Category icon TOURISM AND WELLNESS

2016/2017

Swimming pool Ägeribad, Oberägeri

Oberägeri, Switzerland

Installation of floor and wall coverings

Keep in touch

Subscribe to our newsletter to get Mapei news