MAPECOAT I 650 WT

Two-component, water-dispersed, matt epoxy finish for treating the surface of cementititous substrates.
TECHNICAL DATA:
Mixing ratio: comp A : comp B = 20 : 80.
Consistency of mix: fluid.
Workability time: 40 min.
Dust dry: 3-4 h.
Touch dry: 4-5 h.
Waiting time between first and second coat: 6-24 h according to temperature and level of humidity.
Complete hardening time: 7 days.
Storage: 12 months in its original packaging in a dry area away from sources of heat at a temperature of between +5°C and +30°C.
Consumption: approximately 0.25 kg/m² per coat. Consumption depends on the characteristics of the substrate on which the product is applied and the application method used, and may increase if the surface on which it is applied is uneven.
Packaging: 15 kg kits (A + B).

Certifications

Related documentation

Technical data sheet
Download
Safety Data Sheet
Download
Declaration of performance
Download
Specifications
Download
EPD
Download

Last Projects MAPECOAT I 650 WT

Category icon PUBLIC BUILDINGS AND URBAN DESIGN

2017

Sant Joan de Déu

Esplugues, Barcelona, Spain

Resin floors application

Category icon INFRASTRUCTURES

2016

Bianchi Underpass

Milano, Italy

Concrete restoration

Category icon INFRASTRUCTURES

2015/2016

Railway underpass on Spoleto Street

Milano, Italy

Concrete restoration

Category icon INFRASTRUCTURES

Cucchero Tunnel

Pontremoli, Italy

Waterproofing

Keep in touch

Subscribe to our newsletter to get Mapei news