MAPEWRAP 31

Two-component, medium-viscosity epoxy adhesive for impregnating MAPEWRAP using the “dry system”.
TECHNICAL DATA:
Mixing ratio: comp. A : comp. B = 4 : 1.
Workability time: 40 minutes (at +23°C).
Bond strength to concrete:> 3 N/mm² (after 7 days at +23°C - failure of substrate).
Brookfield Viscosity: 6,500 mPa·s (rotor 3 - 10 revs).
Classification: EN 1504-4.
Consumption: according to the type and width of the fabric.
Packaging:
5 kg kits:
– 4 kg drums (comp. A);
– 1 kg drums (comp. B).

Certifications

Related documentation

Technical data sheet
Download
Declaration of performance
Download
EPD
Download

Last Projects MAPEWRAP 31

Category icon PUBLIC BUILDINGS AND URBAN DESIGN

2017

Majlis Al Midfa Museum

Sharjah, United Arab Emirates

Masonry restoration

Category icon PUBLIC BUILDINGS AND URBAN DESIGN

2016/2017

S. Antuono Church

Venafro, Italy

Structural reinforcement

Category icon PUBLIC BUILDINGS AND URBAN DESIGN

2017

St. Joseph Church

Corato, Italy

Structural reinforcement

Category icon INFRASTRUCTURES

2018

Road number 16 - Santa Caterina

Bari, Italy

Structural reinforcement

Keep in touch

Subscribe to our newsletter to get Mapei news