PRIMER SN

Two-component epoxy primer with fillers.
May be coloured with MAPECOLOR PASTE.
TECHNICAL DATA:
Mixing ratio: component A : component B = 80 : 20.
Colour of mix: neutral.
Consistency of the mix: viscous fluid.
Density of mix (kg/m³): 1500.
Viscosity of the mix (mPa·s): 1,100 ± 100 (# 3 - rpm 50).
Pot life: 30 min.
Application temperature range: from +8°C to +35°C.
Dust dry at +23°C and 50% R.H.: 6 hours.
Set to light foot traffic at +23°C and 50% R.H.: 24 hours.
Final setting time: 7 days.
Storage: 24 months in its original sealed packaging.
Application: flat American trowel or smooth trowel.
Consumption: 0.3-0.7 kg/m² per coat, depending on the absorbency and characteristics of the substrate.
Packaging: 20 kg kits (A+B); 5 kg kits (A+B).

Certifications

Related documentation

Technical data sheet
Download
Declaration of performance
Download
EPD
Download
P.A.S.S.
Download

Last Projects PRIMER SN

Category icon PUBLIC BUILDINGS AND URBAN DESIGN

2020

Quarantine Centre at Junior Police Call Permanent Activity Centre

Pat Heung, Hong Kong

Waterproofing

Category icon PRODUCTION FACILITIES

2019

Re-roofing work at Lee Kum Kee Factory

Tai Po, Hong Kong

Installation of floors, Waterproofing

Category icon COMMERCIAL FACILITIES

2019

Star Properties office

Kwun Tong, Hong Kong

Installation of floors

Category icon TRANSPORTATION

2019

Cathay Pacific Cargo Terminal

Chek Lap Kok, Hong Kong

Waterproofing

Keep in touch

Subscribe to our newsletter to get Mapei news