ROLLCOLL

Multi-purpose adhesive in water dispersion for laying vinyl and textiles floor and wall coverings.
TECHNICAL DATA:
Consistency: creamy paste.
Colour: light beige.
Waiting time: applied by trowel: from 10 to 20 minutes; applied by roller or spray: from 0 to 10 minutes.
Open time:
– applied by trowel: 30-40 minutes;
– applied by roller or spray: 20-30 minutes.
Set to light foot traffic: 3-5 hours.
Ready for use: 24-48 hours.
Storage: 12 months. Protect from frost.
Application: N° 1, 2, 3 MAPEI trowels, TKB A1, A2, B1, B2, roller or spray.
Consumption:
– by trowel: 300-500 g/m²;
– by roller: 200-300 g/m².
Packaging: 1, 5, 12 and 25 kg drums.

Related documentation

Technical data sheet
Download
Safety Data Sheet
Download
EPD
Download

Last Projects ROLLCOLL

Category icon PUBLIC BUILDINGS AND URBAN DESIGN

2018/2019

Joan Kirner Womens and Childrens

Melbourne, Australia

Waterproofing, Installation of floors

Category icon PUBLIC BUILDINGS AND URBAN DESIGN

2016

Sunshine Coast University Hospital

Sunshine Coast, Australia

Installation of floor and wall coverings

Category icon TOURISM AND WELLNESS

2014/2015

Mala Garden Hotel

Siófok, Hungary

New building

Category icon PUBLIC BUILDINGS AND URBAN DESIGN

Victorian Comprehensive Cancer Centre (VCCC)

Melbourne, Australia

Installation of floor and wall coverings

Keep in touch

Subscribe to our newsletter to get Mapei news