Place the alkali resistant glass fibre or basalt fibre mesh on the fresh layer of mortar, taking care to overlap the adjacent meshes longitudinally by approx. 15 cm.
Apply the second coat of two-component high-ductility fibre-reinforced mortar at 5 - 6 mm thickness on the installed mesh, while the first coat of product is still fresh.