System for installing decorative wall coverings and LVT/SPC in damp environments including over existing ceramic tiles

Old Building
Wet environments
Installation of LVT

Products

1
Existing tiles
2
Smoothing compound
Apply one or two layers (wait 2-3 hours between each layer) with a smooth metal trowel to eliminate any irregular or uneven areas between the tiles.
3
Adhesive
Apply the product with a MAPEI No. 1 or TKB A2 notched trowel (for LVT with an uneven back or not particularly flat, use a MAPEI No. 2 or 3 or TKB B1 trowel).
4
LVT / SPC
5
Finishing
Before applying the product thoroughly clean the surface of the LVT with a red or green ULTRACOAT PAD. After mixing the two components as specified (comp. A : comp. B = 5 : 1 in weight), apply a crisscross layer of product with a short-pile roller (such as an ULTRACOAT ROLLER T3 or T5) or by airless spray.
6
Sealant
Apply the one-component acetic silicone sealant in correspondence with expansion joints and joints between the floor and wall.
7
Existing tiles
8
Smoothing compound
Apply one or two layers (wait 2-3 hours between each layer) with a smooth metal trowel to eliminate any irregular or uneven areas between the tiles.
9
Adhesive
Adhesive supplied ready to use and does not require any preparation. Apply the product with a smooth trowel.
10
Decorative glass fibre
11
Protective finishing
After mixing the two components as specified (comp. A : comp. B = 5 : 1 in weight), apply a criss-cross layer of product with a short-pile roller (such as an ULTRACOAT ROLLER T3 or T5) or by airless spray.
You may be interested in Installation of LVT
NOT REMOVE

Keep in touch

Subscribe to our newsletter to get Mapei news