Apply one strip of membrane next to the joint between wall and foundation plinth by removing the protective film on the back. Then apply the waterproofing membrane from top to bottom by gradually removing the protective film and making it adhere to 1 Lean concrete the substrate until it overlaps with
MAPEPROOF FBT applied under the sill plate.