Spread the primary waterproofing membrane on the whole cap and fasten it through thermal welding on the fixing disks.
5
Transparent waterproofing membrane MAPEPLAN TT
Spread the secondary waterproofing membrane (after laying a separation layer if needed) and fasten to the underlying layer through thermal welding.
6
Injection/inspection valve for Mapeplan Vacuum systems MAPEPLAN INJECTION VALVE
Preparation of the valves for injecting the vacuum layer on the protective layer after drilling for the passage of injection resin. Valves fixed by thermal welding.
7
Backup injection system IDROSTOP MULTI + MAPEPLAN END BOX
Preparation of the structural joint waterproofing system by laying IDROSTOP MULTI injectable hoses in correspondence with the Waterstop profiles, with subsequent arrangement of the post-casting injection points through suitable preparation of the hose junction boxes (Mapeplan End Box).
8
PVC waterstop MAPEPLAN WATERSTOP
Place waterstop profiles on structural joints to waterproof them and fasten through thermal welding.
9
PVC protective membrane MAPEPLAN PROTECTION
Spread the protective membrane in areas subject to risk of wear and fasten to the underlying layer through thermal welding.