Spread the waterproof membrane on the whole cap and fasten it through thermal welding on the fixing disks.
5
PVC waterstop MAPEPLAN WATERSTOP
Place waterstop profiles on structural joints to waterproof them and fasten through thermal welding.
6
Backup injection system IDROSTOP MULTI + MAPEPLAN END BOX
Preparation of the structural joint waterproofing system by laying Idrostop Multi injectable hoses in correspondence with the Waterstop profiles, with subsequent arrangement of the post-casting injection points through suitable preparation of the hose junction boxes (Mapeplan End Box).
Installation of the prefabricated drain profile with aggregate filling and suitable drainage network. Fasten to waterproofing membrane through thermal welding.