Hotel du Barrage

Location icon Hérémence, Switzerland
Ref #: 4631
Category: TOURISM AND WELLNESS

Construction

Yard The new linoleum floor of the hotel rooms at Hotel du Barrage was installed with Ultrabond Eco 530.
Location Hérémence, Switzerland
Subcategory HOTEL/INN
Application The old coverings were torn off, the substrates sanded and primed with Eco Prim Grip Plus.
Start and finish date 2022
Application Type Floor/wall covering
Architects Mijong Architecture Design
Specialists involved Grande Dixence SA
MAPEI Coordination Marcello Maieron

Product used for the project

ECO PRIM GRIP PLUS
ECO PRIM GRIP PLUS
From Mapei laboratories, the multi-purpose universal primer with almost no…
PLANIPATCH XTRA
PLANIPATCH XTRA
PLANIPATCH XTRA is a fine-grained , ultra-fast drying thixotropic cementitious…
ULTRABOND ECO 530
ULTRABOND ECO 530
Adhesive with high and fast initial bond. For the wet-bed installation of…
ULTRAPLAN ECO XTRA
ULTRAPLAN ECO XTRA
Product not available for this market,
contact us

Keep in touch

Subscribe to our newsletter to get Mapei news