Latymer Upper School

Location icon London, United Kingdom
Ref #: 8
Category: PUBLIC BUILDINGS AND PLACES

Construction

Yard pools and locker rooms
Location London, United Kingdom
Subcategory SCHOOL
Opened in 2016
Application waterproofing and ceramics installation
Application Type Floor/wall coverings
Contractor company Jerram Faulkus
Installer companies Tiletec Group
Other Throughout the extensive project, Mapei systems were specified from the substrate to the finishing materials, in order to provide a warrantable system build-up. The total application included 2,500 m2 of Mapei products from screed binders, render substrates and a range of floor and wall adhesives.

The new two-storey building consists of a six lane competition swimming pool and wet changing facilities on the ground floor. The second floor comprises of a fitness suite with the project including a re-fit of existing sports hall and dry changing areas.

Product used for the project

GRANIRAPID
GRANIRAPID
Two-component, high-performance, deformable, quick-setting and drying…
KERAFLEX
KERAFLEX
Keraflex is the family of cementitious adhesives characterised by high…
MAPELASTIC
MAPELASTIC
Two-component, flexible cementitious mortar for waterproofing balconies,…
PLANITOP FAST 330
PLANITOP FAST 330
Quick-setting, fibre-reinforced cementitious levelling mortar for internal and…
4007
4007
Product not available for this market,
contact us

Keep in touch

Subscribe to our newsletter to get Mapei news