| Yard | The tunnel has a length of 24.5 feet (7.48 m) | 
|---|---|
| Location | Fort Wayne, USA | 
| Subcategory | TUNNEL | 
| Built in | 2018 | 
| Opened in | 2021 | 
| Application | MAPEI’s Underground Tunnel Team (UTT) of experts helped with the tunneling operations and concrete repairs for the overflow of sewage and the cleanup of Fort Wayne’s rivers. | 
| Start and finish date | 2018/2022 | 
| Application Type | Products for underground construction (utt), Road maintenance and urban design | 
| Client | City of Fort Wayne, Indiana | 
| Contractor company | Salini-Lane Healy | 
| MAPEI Coordination | James Pinkley, Dr. Cristina Oñate and Tanner Murt | 