| Yard | Renovation and change of use of the premises of the physiotherapy practice. | 
|---|---|
| Location | Bex, Switzerland | 
| Subcategory | HOSPITAL | 
| Application | The floor subfloors had to be levelled before installation. This was achieved by means of spot filling, vapour retarders and final smoothing. In addition, 320m² of LVT flooring was laid with Ultrabond Eco 4 LVT. | 
| Start and finish date | 2022 | 
| Application Type | Installation of floors | 
| Architects | JME architecture SA | 
| Specialists involved | Start.Physio | 
| MAPEI Coordination | Marcello Maieron |