Browse by PRODUCT LINES
All product lines
Search products
In the spotlight
Ultratop [NA] is a self-curing topping that is specially formulated for fast-track resurfacing, allowing Ultratop [NA] to be polished 24 hours after being installed. Also, the polishing process of Ultratop Terrazzo System is a “dry” process, so you do not need to manage the dirty water.
Technical Services at 1-800-992-6273
Customer Service at 1-800-426-2734 (1-800-42-MAPEI)