Position a series of levelling guides, spread the mix, carefully compact the mix and float-finish the surface. The thickness over the heating elements must be at least 3 cm. Insert metal reinforcing mesh at the mid-point or add
MAPEFIBRE ST30 structural fibres to the mix.