Popis | The existing gallery was extended by 320 metres with the new building. |
---|---|
Poloha | Disentis, Švajčiarsko |
Podkategória | TUNEL |
Aplikácia | By extending the avalanche gallery, the average duration of closures of the Lukmanier road can be reduced from 37 days today to 19 days in the future. A total of 9 400 m³ of Dynamon SR 912 CH was used. |
Dátum začiatku a dokončenia | 2021 |
Typ aplikácie | Úprava vozovky |
Realizačná spoločnosť | Matteo Muttoni Costruzioni SA, Via Murate 6, 6500 Bellinzona |
Projektový manažér | Kanton Graubünden |
Koordinátor MAPEI | Marco Jungi |